Jump to content
Sign in to follow this  
Billyk24

Wexford, Pa. GetGo E85 pumps out and are awaiting for new stainless steel version.

Recommended Posts

These pumps have been out of commission for over two weeks.  Asked the station attendant and was told a new stainless steel pump is needed due to the high corrosive nature of E85.  Estimated another two weeks for repair/replacement.   Note this station opened in 2009 and it is hard to believe something worn out in seven years.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
Sign in to follow this  

×
×
  • Create New...